RAIB Report on accident at Beech Hill AHB, Dec 2013

Discussion concerning level crossings

RAIB Report on accident at Beech Hill AHB, Dec 2013

Unread postby John Webb » Wed Sep 25, 2013 12:00 pm

RAIB report just published:
http://www.raib.gov.uk/cms_resources.cfm?file=/130924_R172013_Beech_Hill.pdf

Summary:
At 12:31 hrs on Tuesday 4 December 2012 a collision occurred between a passenger train and a car at Beech Hill automatic half barrier (AHB) level crossing near Finningley, on the line between Gainsborough and Doncaster. One of the occupants of the car, a young child, was seriously injured in the collision and later died in hospital.

The train involved was operated by East Midlands Trains. It consisted of a single carriage unit and was travelling at 60 mph (96 km/h) at the time of the collision. None of the 20 passengers and two crew members on the train was injured in the accident. Equipment beneath the train was damaged in the collision leading to the spillage of diesel fuel from the train’s fuel tank, but there was no fire.

The level crossing was owned and maintained by Network Rail and was fitted with a data logger which showed that the crossing was operating normally at the time of the accident, with the barriers down as the car approached. The car driver stated that she did not see that the road traffic light signals (known as wig-wags) were flashing as she approached and only noticed the lights and barriers when she was very close to the crossing. The weather was sunny at the time of the collision but there had been rain showers earlier and the road surface was wet, leading to glare from the low winter sun.

The RAIB took the wig-wag units and arranged for testing in an optical laboratory. It was found that they were fitted with 36 W lamps and an obsolete design of red lens unit. Their light output was measured to be well below the specification for lights of this type. Network Rail had no plans in place to replace the light units with brighter ones and had no process to identify that such replacement was necessary.

The RAIB has made four recommendations as follows:
* infrastructure managers to determine which level crossings are fitted with 36 W lamps and draw up plans for their replacement with LED units;
* infrastructure managers to devise a method of assessing the risk of a bright background and glare preventing wig-wag signals from being seen and propose means of mitigating this;
* infrastructure managers to introduce a new ‘brighter’ type of LED wig-wag for use at sites where sunlight glare has been identified as a problem; and
* infrastructure managers to enhance the inspection and maintenance process for wig-wag lamps.
John Webb
(Member, St Albans Signalbox Trust)
User avatar
John Webb
Main line box
Main line box
 
Posts: 1814
Joined: Tue Jul 8, 2008 1:22 pm
Location: St Albans, Herts

Re: RAIB Report on accident at Beech Hill AHB, Dec 2013

Unread postby Richard Pike » Fri Sep 12, 2014 7:16 pm

I'm up that way reinstating a ground frame and have noticed Beech Hill crossing is closed until 29th September. It's been closed for the last three weeks or so too. Anyone know why?
Richard..
Richard Pike
Main line box
Main line box
 
Posts: 1721
Joined: Thu Nov 8, 2007 9:19 pm
Location: GN(southern area)

Re: RAIB Report on accident at Beech Hill AHB, Dec 2013

Unread postby BHornsey » Fri Sep 12, 2014 8:58 pm

Richard Pike wrote:I'm up that way reinstating a ground frame and have noticed Beech Hill crossing is closed until 29th September. It's been closed for the last three weeks or so too. Anyone know why?


I'm not aware of it and I'm a signaller at Donny. Are you sure it isn't weekends only - we have a series of weekend Joint Line closures (Friday pm to Monday am) for upgrade work (mostly track improvements and bridge clearances to allow 9' 6" container traffic). This has been going on for a couple of months. Last month the Joint was closed for three weeks straight but currently just weekends.

BTW, which GF?
BHornsey
Branch line box
Branch line box
 
Posts: 200
Joined: Mon Feb 1, 2010 3:33 pm
Location: Doncaster

Re: RAIB Report on accident at Beech Hill AHB, Dec 2013

Unread postby Richard Pike » Fri Sep 12, 2014 9:27 pm

I don't know if it is open at weekends but for the last three weeks i've driven past the end of the road on my journey from Haxey to my hotel in Doncaster and the signs say 'ROAD CLOSED AT LEVEL CROSSING AHEAD' The road is clearly coned off at the crossing itself.
Richard..
Richard Pike
Main line box
Main line box
 
Posts: 1721
Joined: Thu Nov 8, 2007 9:19 pm
Location: GN(southern area)

Re: RAIB Report on accident at Beech Hill AHB, Dec 2013

Unread postby push-pull » Sat Sep 13, 2014 10:17 am

Think this link might explain the closure.....
http://www.networkrailmediacentre.co.uk ... -2150.aspx

Moderator Note: Topic locked as its drifting off subject.