Unread postby JRB » Tue Feb 25, 2014 11:33 pm

Half barriers are due to be commissioned at Morar this week.
JRB
Double-manned box
Double-manned box
 
Posts: 3216
Joined: Sun Dec 9, 2007 10:12 pm
Location: GWR

Re: Morar

Unread postby JRB » Thu Mar 20, 2014 11:46 pm

Work at Morar half barriers was suspended Tuesday when a lorryload of bitumen for the road surface caught fire. It was driven flaming to a safe place by a petrol station and primary school. The existing crossing arrangements, luckily, are not yet dismantled.
Last edited by JRB on Fri Mar 21, 2014 3:22 pm, edited 1 time in total.
JRB
Double-manned box
Double-manned box
 
Posts: 3216
Joined: Sun Dec 9, 2007 10:12 pm
Location: GWR

Re: Morar

Unread postby Mike Hodgson » Fri Mar 21, 2014 12:12 am

Eh ?? By a petrol station doesn't sound a very safe place for a burning vehicle to me.
User avatar
Mike Hodgson
Main line box
Main line box
 
Posts: 2485
Joined: Fri Nov 9, 2007 5:30 pm
Location: N Herts

Re: Morar

Unread postby JRB » Fri Mar 21, 2014 2:49 pm

My informant thought likewise. It was believed that they relied on the garage having plenty of extinguishers and a good water supply regardless of other considerations. It was at least brave to drive the lorry away from such things as the station buildings. It ill doubtless be fully reported in Westword - their editorial office is in Morar station.
JRB
Double-manned box
Double-manned box
 
Posts: 3216
Joined: Sun Dec 9, 2007 10:12 pm
Location: GWR

Re: Morar

Unread postby JRB » Sun Aug 24, 2014 4:40 pm

Scroll down:

http://www.road-to-the-isles.org.uk/westword/index.html

for first train to use the barriers.
JRB
Double-manned box
Double-manned box
 
Posts: 3216
Joined: Sun Dec 9, 2007 10:12 pm
Location: GWR