Signals

THE SIGNAL BOX


Railway signalling discussion

Ufton Nervet bridge replacement

Discussion concerning level crossings

Ufton Nervet bridge replacement

Unread postby AN106 » Tue Apr 14, 2015 7:08 am

A Network rail statement about the possible replacement of Ufton Nervet AHB with a bridge can be found here.
User avatar
AN106
Crossing box
Crossing box
 
Posts: 50
Joined: Fri Apr 30, 2010 7:50 am

Re: Ufton Nervet bridge replacement

Unread postby Mike Hodgson » Tue Apr 14, 2015 8:11 am

This sounds like a PR inspired case of bolting the stable door.

Is there any real reason to suppose this particular crossing is more likely to have a future accident than many others similar to it? Past performance is not necessarily an indicator for the future as the financial services industry keeps on repeating monotonously under their regulatory requirements. Doesn't the same principle apply to the accident statistics at particular locations?




Edited by admin
User avatar
Mike Hodgson
Main line box
Main line box
 
Posts: 2461
Joined: Fri Nov 9, 2007 5:30 pm
Location: N Herts

Re: Ufton Nervet bridge replacement

Unread postby Peter Gibbons » Thu Apr 16, 2015 4:24 pm

Perhaps not, but Network Rail has stated that it wants to close as many level crossings as is possible, particularly those on lines with where high speeds are involved.
Peter G
User avatar
Peter Gibbons
Branch line box
Branch line box
 
Posts: 147
Joined: Fri Nov 9, 2007 1:07 pm
Location: Hassocks, West Sussex

Re: Ufton Nervet bridge replacement

Unread postby edwin_m » Thu Apr 16, 2015 4:50 pm

Ufton crossing is just by the end of some loops - I think the accident report considered that the presence of facing points contributed to the severity of the major accident there, and they probably also mean the crossing is more complicated and costly to renew than most. There has also been at least one other fatality there since the major accident. As it is in a rural are with no buildings nearby a bridge is also relatively easy to provide, so this crossing is likely to be one of the more cost-effective ones for replacement.
edwin_m
Rest-day relief
Rest-day relief
 
Posts: 709
Joined: Sun Jul 5, 2009 8:30 pm


Return to Level crossings

Who is online

Users browsing this forum: No registered users and 2 guests