Gentlemen (and Ladies),
A very quick question, just seeking confirmation really - BR(W) bracket signal, on a single line for a point. Right arm reads for the main, Left arm reads for a goods yard.
Right arm - 4'
Left arm - 3'?
guard_jamie wrote:How rigidly was this stuck to? Whilst I'm aware practise on a heritage railway may not always match the rules of the past, I can think of two examples on the SVR where 3' arms read into a yard - and I believe one of them to be a pre-preservation installation.
Offhand I can't think of locations with arms leading into sidings but I don't doubt there were some - for every rule there is always an exception!
Return to Signalling - model railways/simulators
Users browsing this forum: No registered users and 2 guests