After many eons of contemplation I have finally decided to model Grassington as per John Hinson's 1950 version drawn 13/10/11. I have completed the Templot templates and the baseboards. During the next, track laying, stage I wish to make sure that I can signal and interlock the layout mechanically. So far I believe I can cover most of the interlocking as I have ready many books including but not limited to the following; IRSE Green Books, "Trax 3" Signalling and Lever Frames by Jeff Geary and have downloaded Sigscribe 4 by Modratec. Each source is helpful. However, I always come to a halt when I get to lever 16 - the shunt signal from the Shunting Line to either Up Platform or Down Platform. If someone has the whole interlocking table I would be glad of a copy otherwise the bit that covers the above two routes would be most helpful.
Thanking You in anticipation
Cheers Godders