Re: Nottingham Resignalling

Unread postby Mike Stone » Fri Nov 7, 2014 11:56 am

I saw the EMT reply to the network change proposal which read as though the movement of the crossover wasn't included, at least initially. The proposed timetable has the Lincoln services leaving Nottingham later and arriving earlier, and a skip stop pattern for the Newark services which certainly allows for a shunt.
;
Hopefully post-resignalling they will re-think that.
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1106
Joined: Fri Nov 16, 2007 2:50 pm

Re: Nottingham Resignalling

Unread postby edwin_m » Fri Nov 7, 2014 7:28 pm

The Newark crossover is in the platforms. It has been used in the past for reversing a train which then enters service in the platform but I think this is only possible with a two-car unit because of the length available between the crossover and the end of the UP platform.
edwin_m
Rest-day relief
Rest-day relief
 
Posts: 708
Joined: Sun Jul 5, 2009 8:30 pm

Re: Nottingham Resignalling

Unread postby Mike Stone » Fri Feb 19, 2016 5:32 pm

I noticed last time I was there a 156 was only just clear after crossing and doubt it will be acceptable following resignalling.
;




http://newarkadvertiser.co.uk/articles/ ... sDPJiBXlIB
;
another preservation group.
;
The article refers to boarding it up because it is in a conservation area.
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1106
Joined: Fri Nov 16, 2007 2:50 pm

Re: Nottingham Resignalling

Unread postby Andrea » Fri Feb 19, 2016 6:19 pm

Being a Midland Railway wooden box moving it to another location would be comparitively easy.
User avatar
Andrea
Branch line box
Branch line box
 
Posts: 145
Joined: Fri Oct 29, 2010 12:12 pm
Location: Nottingham

Re: Nottingham Resignalling

Unread postby John Webb » Sat Feb 20, 2016 10:08 am

The main theme of the article and the comments that follow is that people want to see it preserved where it stood. Their main problem, of course, is the close proximity of the box to the running line, which won't make 'in-situ' preservation easy, particularly for the maintenance needed thereafter.

Is the frame in the rear of the box - just that in the 1968 photo the stove chimney seem to be at the front?
John Webb
(Member, St Albans Signalbox Trust)
User avatar
John Webb
Main line box
Main line box
 
Posts: 1798
Joined: Tue Jul 8, 2008 1:22 pm
Location: St Albans, Herts

Re: Nottingham Resignalling

Unread postby Mike Stone » Sat Feb 20, 2016 1:27 pm

Ideally the crossover ought to be replaced by a facing one on the Nottingham side of the station.
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1106
Joined: Fri Nov 16, 2007 2:50 pm

Re: Nottingham Resignalling

Unread postby vic south » Sat Feb 20, 2016 8:04 pm

The frame is, indeed, in the rear of the box. There is still the odd piece of MR furniture lurking amidst the 'B&Q' kitchen and computer terminal but sadly the stove is long gone!
vic south
Crossing box
Crossing box
 
Posts: 61
Joined: Sun Mar 25, 2012 8:52 am

Re: Nottingham Resignalling

Unread postby Mike Stone » Fri Jul 1, 2016 6:07 pm

A new trailing crossover has been installed at Newark Castle nearer Lincoln. There is what appears to to be the base for a VMS signal just on the Lincoln side of the up platform and no sign of any work between the platform and crossing. Surely the intention isn't to cross the empties over and only allow them into the platform to enter traffic once the barriers are down?
';
It may be for down direction moves but there is no sign of a facing crossover going in nearer Nottingham.
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1106
Joined: Fri Nov 16, 2007 2:50 pm

Re: Nottingham Resignalling

Unread postby Fast Line Floyd » Fri Jul 1, 2016 8:10 pm

The scheme plan shows the crossover being moved around 13 chains towards Collingham with a new two aspect (red and green) NN4091 to take trains back from the Up platform towards the Down line.
Graham
User avatar
Fast Line Floyd
Main line box
Main line box
 
Posts: 1595
Joined: Tue May 26, 2009 11:42 am
Location: Raunds

Re: Nottingham Resignalling

Unread postby nicjoynson » Thu Aug 25, 2016 12:06 pm

Is there a target date for resignalling of Fiskerton, Lowdham and Staythorpe?

Nic
nicjoynson
Trainee
Trainee
 
Posts: 3
Joined: Thu Aug 25, 2016 11:58 am

Re: Nottingham Resignalling

Unread postby Fast Line Floyd » Fri Aug 26, 2016 10:08 am

nicjoynson wrote:Is there a target date for resignalling of Fiskerton, Lowdham and Staythorpe?

Nic

Currently sits at 24th Oct 2016 as sign in day and closure day for the old boxes is 21st Oct 2016.
Graham
User avatar
Fast Line Floyd
Main line box
Main line box
 
Posts: 1595
Joined: Tue May 26, 2009 11:42 am
Location: Raunds

Re: Nottingham Resignalling

Unread postby Shed 34F » Sun Aug 28, 2016 4:45 pm

nicjoynson wrote:Is there a target date for resignalling of Fiskerton, Lowdham and Staythorpe?

Nic

Road closures will affect the level crossings as shown below to allow the installation of the new crossing equipment. pedestrian access will be maintained with an attendant on duty and a special method of working in place. At Newark Castle only half the road will be closed so no special working will be required.

Code: Select all
Lowdham - 17/09/2016 to 03/10/2016
Bleasby - 17/09/2016 to 03/10/2016
Fiskerton Jn (Morton) - 08/10/2016 to 24/10/2016
Rolleston - 08/10/2016 to 24/10/2016
Fiskerton Station - 08/10/2016 to 22/10/2016
Staythorpe - 22/10/2016 - 07/11/2016
Newark Castle - 15/10/2016 to 16/10/2016 and 06/11/2016 to 07/11/2016


The closure dates for each signal box:
Lowdham - 03/10/2016
Fiskerton Jn - 24/10/2016
Fiskerton Stn - 24/10/2016
Rolleston - 24/10/2016
Staythorpe - 07/11/2016
Newark Castle - 07/11/2016

Follwoing the closure of Lowdham, Fiskerton Jn will form a fringe to EMCC Netherfield W/S with a temporary method of working in place (Expected to be TCB 3.5 working), until Fiskerton Jn, Fiskerton Stn and Rolleston close. When this happens the temporary fringe will move to Staythorpe until 07/11/2016 where the fringe will move permanently to Doncaster PSB.
One on the Up
User avatar
Shed 34F
Crossing box
Crossing box
 
Posts: 73
Joined: Fri Nov 9, 2007 2:02 pm
Location: Yellabelly Country

Re: Nottingham Resignalling

Unread postby TerryK » Thu Nov 3, 2016 1:52 pm

This coming week-end will see the final phase of the re-signalling of the East Notts Project 4/5/6/ November 2016
TerryK
Crossing box
Crossing box
 
Posts: 51
Joined: Wed Jul 2, 2014 9:30 am

Re: Nottingham Resignalling

Unread postby Shed 34F » Sun Nov 6, 2016 11:33 pm

It comes to a sad end as Staythorpe and Newark Castle have now closed. :cry:

Staythorpe (00:44) and Newark Castle (00:55) respectively on Saturday 05/11/16. After 16 years of working the line i pity the travelling public that no longer see a friendly face at the signal box window and the barren desolation for drivers on the route. Progress? Maybe...
One on the Up
User avatar
Shed 34F
Crossing box
Crossing box
 
Posts: 73
Joined: Fri Nov 9, 2007 2:02 pm
Location: Yellabelly Country

Re: Nottingham Resignalling

Unread postby Mike Stone » Wed Nov 9, 2016 9:41 pm

Newark Castle crossing appears to be CCTV rather than Obstacle Detector . I presume the others are OD?
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1106
Joined: Fri Nov 16, 2007 2:50 pm