Unread postby Train approaching » Fri Nov 10, 2017 11:49 pm

With the new station due to open next month, does anyone know how far the new signalling and track work has progressed at Leamington Spa? I gather that there is still a lot of work to be carried out on Kenilworth station itself.
Train approaching
Branch line box
Branch line box
 
Posts: 109
Joined: Fri Sep 19, 2014 7:38 am

Re: Kenilworth due to open on 10 December

Unread postby The Planner » Sat Nov 11, 2017 10:57 am

Station won't open on the 10th from what I have heard, too much to do at the station itself. Track slew and Foundry Wood Jn at Leamington should have been completed over the last weekend in October.
The Planner
Branch line box
Branch line box
 
Posts: 229
Joined: Sat Mar 27, 2010 6:28 pm

Re: Kenilworth due to open on 10 December

Unread postby Train approaching » Sat Nov 11, 2017 1:59 pm

Is that as in should have been but wasn't? Is there any indication (approx) when it might open?
Train approaching
Branch line box
Branch line box
 
Posts: 109
Joined: Fri Sep 19, 2014 7:38 am

Re: Kenilworth due to open on 10 December

Unread postby pbinnersley » Sat Nov 11, 2017 11:49 pm

The track slew at Kenilworth was completed on the weekend of 28/29th September and the replacement CB 6505 commissioned (the original was in the way of the slewed line). I don't know if anything was done at Foundry Wood junction.

The station building is just a windowless shell so I wouldn't expect it to open any time soon.
pbinnersley
Crossing box
Crossing box
 
Posts: 21
Joined: Sat Mar 6, 2010 6:03 pm

Re: Kenilworth due to open on 10 December

Unread postby Mike Stone » Sun Nov 12, 2017 10:07 am

There is an all line block at Leamington today - no engineers trains shown on the maps which suggests either signalling work( or nothing happening).
;
http://www.kenilworthweeklynews.co.uk/n ... -1-8207176
;
I notice that the instruction in the train planning rules about not planning passenger trains to cross in Kenilworth loop has disappeared - was that for signalling reasons or just to remove the possibility of passengers attempting to alight?
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1132
Joined: Fri Nov 16, 2007 2:50 pm

Re: Kenilworth due to open on 10 December

Unread postby The Planner » Sun Nov 12, 2017 10:38 am

Never understood what it was for. There was always an issue with the overlap overlapping an opposite overlap at the Leamington end of the loop meaning a down train had to be held way back when putting one in the loop. The station works are going to eradicate that.
The Planner
Branch line box
Branch line box
 
Posts: 229
Joined: Sat Mar 27, 2010 6:28 pm