Thought I'd share the latest forecasts of NR's active projects and their associated commissioning dates:

22/01/2018 - Huddersfield-Bradford Recontrol: Stage 1 - Heally Mills & Huddersfield
29/01/2018 - Blackpool-Preston Resignalling & Recontrol: Stage 1 - Preston-Kirkham-Blackpool(South)
26/03/2018 - Blackpool-Preston Resignalling & Recontrol: Stage 2 - Kirkham-Blackpool(North)
26/03/2018 - North Wales Coast Resignalling & Recontrol: Stage 1 - Chester-Llandudno Jnc. (excl)
09/05/2018 - Wavertree Resignalling & Recontrol: Stage 2&3 - Halton & Ditton Stage
27/03/2018 - Ferriby-Gilberdyke Recontrol
20/10/2018 - Huddersfield-Bradford Resignalling: Stage 2 - Halifax (Hebden Bridge, Milner Royd, Halifax, Bradford Mill Lane SBs)
31/12/2018 - Newhaven/East Coast Resignalling
31/12/2018 - Wavertree Resignalling & Recontrol: Stage 1 - Allerton & Speke Stage
31/03/2019 - Aberdeen-Inverness Resignalling & Recontrol: Stage 2 - East interventions - 31/03/2019 (Dyce & Inverurie SBs)
31/03/2019 - Norwich-Lowestoft Resignalling

Several others forecast for Xmas 2018, but they're large schemes and aren't yet live, so sceptical that they'll make end of CP5 (April 2019).
collexions
Crossing box
Crossing box
 
Posts: 25
Joined: Thu Jan 30, 2014 10:48 am

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby StockControl » Sat Feb 10, 2018 11:15 pm

Do you as yet have any updates on provided information, ie Bristol Temple Meads over Easter?

Thanks for posting.
StockControl
Crossing box
Crossing box
 
Posts: 11
Joined: Fri Mar 14, 2014 11:13 pm

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby S&TEngineer » Sun Feb 11, 2018 8:48 am

StockControl wrote:Do you as yet have any updates on provided information, ie Bristol Temple Meads over Easter?

Thanks for posting.

Bristol station recontrol is going ahead over Easter 2018 (well, it was last week anyway). Filton Bank 4 Tracking is going ahead over Xmas/New Year 2018/9.
Regards,
S&TEngineer
-----------------------------------------------------
Out of this nettle, Danger, we pluck this flower, Safety.
Henry IV, Part 1, Act 2, Scene 3
User avatar
S&TEngineer
Moderator
Moderator
 
Posts: 1650
Joined: Fri Nov 9, 2007 8:17 pm
Location: Somewhere in the far South West

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby colin1501 » Sun Feb 11, 2018 9:23 am

Probably a slightly dense question, but can I ask what is the difference between re-signalling and re-control?

Thanks,

Colin
colin1501
Branch line box
Branch line box
 
Posts: 158
Joined: Fri Mar 14, 2014 5:24 pm
Location: Hampshire

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby Danny252 » Sun Feb 11, 2018 10:31 am

Re-control involves no (or minimal) changes on the ground, with the signals etc. simply being controlled from a new location. Re-signalling implies more drastic changes on the ground.
Danny252
Rest-day relief
Rest-day relief
 
Posts: 710
Joined: Thu Aug 26, 2010 4:39 pm
Location: As close to the levers as they'll let me be

Re: CP5 cRe-signalling/Re-control Scheme Forecast Commission

Unread postby colin1501 » Sun Feb 11, 2018 1:50 pm

Thanks - but then, why is Ferriby to Gilberdyke described as 're-control' when it involves the replacement of semaphores by colour-lights and the abolition of a number of mechanical signalboxes? Conversely, Newhaven/East coast is described as resignalling, although I understand all the signals on the Newhaven/Seaford branch are relatively new colour-lights (2013). All that needs doing is the transfer of control from the existing boxes to Three Bridges ROC, which sounds like re-control!
colin1501
Branch line box
Branch line box
 
Posts: 158
Joined: Fri Mar 14, 2014 5:24 pm
Location: Hampshire

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby Mike Stone » Sun Feb 11, 2018 8:26 pm

A NR press release issued last week refers to "recontrol" from Ferriby to Gilberdyke, which I initially misread as meaning it was happening next weekend. However a report on another group suggests it will now not happen this year.
Mike Stone
Mike Stone
Rest-day relief
Rest-day relief
 
Posts: 1176
Joined: Fri Nov 16, 2007 2:50 pm

Re: CP5 cRe-signalling/Re-control Scheme Forecast Commission

Unread postby Peter Gibbons » Mon Feb 12, 2018 5:35 pm

colin1501 wrote:Thanks - but then, why is Ferriby to Gilberdyke described as 're-control' when it involves the replacement of semaphores by colour-lights and the abolition of a number of mechanical signalboxes? Conversely, Newhaven/East coast is described as resignalling, although I understand all the signals on the Newhaven/Seaford branch are relatively new colour-lights (2013). All that needs doing is the transfer of control from the existing boxes to Three Bridges ROC, which sounds like re-control!


Not all the signals on the Newhaven and Seaford line are colour light signals though. There are still a couple of semaphore signals about and most of the points at Newhaven Harbour still mechanically worked. In addition Absolute Block still exists between Newhaven Town and Newhaven Harbour.

The only signals that were new in 2013 were those controlled from Newhaven Town, when I believe the lever frame was replaced by a temporary panel. Lewes signal box is also due to go at some point, and that panel in that box dates from 1976.
Peter G
User avatar
Peter Gibbons
Branch line box
Branch line box
 
Posts: 164
Joined: Fri Nov 9, 2007 1:07 pm
Location: Hassocks, West Sussex

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby Craig » Thu Feb 15, 2018 9:46 am

Motherwell North Signalling Renewals commissioning dates for the resignalling and recontrol to West of Scotland Signalling Centre, Glasgow.

03/04/18 - Phase 2, WSSC Whifflet workstation (abolition of panels 2&3 at Motherwell)
30/08/18 - Phase 3, WSSC Motherwell workstation (abolition of panels 4&5 at Motherwell)
Craig
Crossing box
Crossing box
 
Posts: 80
Joined: Tue Jul 14, 2009 2:09 pm
Location: Falkirk

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby Freightmaster » Fri Feb 16, 2018 10:13 pm

Anything planned for Port Talbot PSB in the next 12 months??
Freightmaster
Trainee
Trainee
 
Posts: 3
Joined: Wed Jan 3, 2018 3:05 pm

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby barriersraised » Tue Feb 20, 2018 6:39 pm

Seems after CP5 the big bang projects will be either delayed or cancelled

https://www.networkrail.co.uk/feeds/net ... ia-region/

Nothing much for EA and mend and make do seems the approach so we hear.
barriersraised
Trainee
Trainee
 
Posts: 4
Joined: Tue Feb 20, 2018 6:25 pm

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby S&TEngineer » Tue Feb 20, 2018 10:14 pm

The DfT has clearly stated that in CP6 NR will only be funded for maintenance and renewal, with a separate budget to allow completion of major projects started in CP5 but that need to be completed, due to delays, in CP6. Future major projects will be separately funded, and may be delivered by partners other than NR. This has come about due to the inability of NR to deliver enhancement projects to time and budget.
Regards,
S&TEngineer
-----------------------------------------------------
Out of this nettle, Danger, we pluck this flower, Safety.
Henry IV, Part 1, Act 2, Scene 3
User avatar
S&TEngineer
Moderator
Moderator
 
Posts: 1650
Joined: Fri Nov 9, 2007 8:17 pm
Location: Somewhere in the far South West

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby barriersraised » Wed Feb 21, 2018 12:50 am

To be fair no rail company has managed to complete a project on time and within budget. Cromer line resig 17mill end up 30mill.
As for private investment lol takes 20_40 years to get your money back on sleepers let alone anything else


Netty rail live in a dream world and while other folk cream the money off the railways nothing will change
barriersraised
Trainee
Trainee
 
Posts: 4
Joined: Tue Feb 20, 2018 6:25 pm

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby S&TEngineer » Wed Feb 21, 2018 8:21 am

Moderator Note:This is a forum to discuss signalling related matters. Please do not start a political discussion here.
Regards,
S&TEngineer
-----------------------------------------------------
Out of this nettle, Danger, we pluck this flower, Safety.
Henry IV, Part 1, Act 2, Scene 3
User avatar
S&TEngineer
Moderator
Moderator
 
Posts: 1650
Joined: Fri Nov 9, 2007 8:17 pm
Location: Somewhere in the far South West

Re: CP5 Re-signalling/Re-control Scheme Forecast Commissioni

Unread postby barriersraised » Wed Feb 21, 2018 4:11 pm

Sorry my intention was not to start a political post. I was merely pointing what was happening from CP5 into CP6 what I have been told, also making it a full story saying why it wouldn't change.

I will go back to lucking instead :)
barriersraised
Trainee
Trainee
 
Posts: 4
Joined: Tue Feb 20, 2018 6:25 pm

Next

Return to Signalling - current

Who is online

Users browsing this forum: Google [Bot] and 3 guests